COB led 316 stainless steel underground light
Description |
Product name | | COB led 316 stainless steel underground light |
Watt | | 13W |
Size: | | D145x135mm |
Input Voltage | | AC100-220V |
LED Brand | | COB LED |
Material | | Aluminium |
LED Lamp Life<Hour> | | >50,000 hours |
Relevant Certificate | | CE, RoHS,EMC |
Warranty | | 5 years |
Finishing | | Painted white |
Beam Angle | | 20 degrees |
Color Temperature | | Warm white 3000K |
| Neutral White 4000K |
| Cool White 6000K |
Operating Temperature | | -20-35 degree |
Application Environment | | Outdoor Use (IP67) |
Introduction
1. High lumens, High brightness.
2. Longevity service with minimal maintenance
3. Low power consumption, high intensity, low lumen attenuation.
4. Optimized heat sink design to ensure a excellent heat dissipation system.
5. Easy installation and ultra energy efficient, can directly replace incandescent/halogen lamp.
MOQ:
1. For all models,If the items in stock ,MOQ is 1pcs,if no , MOQ is 30pcs and the produce time is 15-20 days.
when we received your order,we will let you know the stock information and the delivery time.
2. If change the LED color temperature, CREE XPE and COB LED,MOQ 5pcs,under the MOQ,add the extra costs 15USD of each item.the SMD LED,MOQ 30pcs,under the MOQ, add the extra costs 45USD.
3. If change the finish for painting in black or in white,the MOQ 30pcs.If it's the special finish,the MOQ 100pcs.
4.The oxidizing finish change to in Glod,Black,Silver,and the electroplating finish change to Painting,MOQ 30pcs.
5. If the Painting finish change to the electroplating,MOQ 100pcs
6. If change the size,such as the lenght,width or other,if no problem,MOQ 100pcs.
7. Normally we will put 10-30 pcs for each item 3000K in the stock.
OEM:
1. The turn-milling items,MOQ 100pcs,no the mould charges.
2. The punching press and flow forming items,MOQ 100pcs,according to the size and the mould charges about 85-1000USD.
3. The aluminum material mould,MOQ 200KG original material + Mould charges.
4. The pressure casting and plastic mould,MOQ 300pcs+Mould charges,according to the size and the mould charges about 1670-5000USD.
Produce time:
1. We delivery goods from the stock about 2-3days after we received the confirmed order and the payment.
2. If some items is no the stock, the produce time is 15-20 days.
3. If change the size,the produce time is 20-25days.
4. If the new mould,and confrim the first sample,the produce time is 25-30days.
5. If The pressure casting and plastic moulds,the produce time is 35-45days.
Payment term:
1. We accept T/T 30% deposit when order is sealed and 70% balance before shippment only.
2. T/T100% in advance if total value under $3000 an order
Download our full catalogue from Dropbox share link:
?dl=0
If you are looking for an unique quality lighting product, you will be confident that you finally have the answer when you get this catalogue.
our showroom
About us
Certificate including the led wall light